View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Facilitation Dot Estimation | ![]() Decision Making Three-Point Estimation |
|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 2-12 Wochen | 5-20 min | 10-30 min je Item |
Participantsdifferent | 3-10 | 3-20 | 1-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Effort Heatmap, Risk Signals, Discussion Targets | Three-Point Estimate, Risk Range, Assumption Notes |
Tagsno overlap | Continuous improvementQualityProcess improvement | EstimationEffortRisk | EstimationUncertaintyForecasting |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






