View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Delivery RAID Log | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) |
|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. |
Complexitydifferent | Low | Low | High |
Timedifferent | 8-15 min | 30 min Setup, dann laufend | Several meetings plus preparation and analysis; total effort depends on scope |
Participantsdifferent | 1-10 | 1-3 maintaining, briefing for everyone | Evaluation team, architects, and relevant stakeholders |
Formatdifferent | Workshop | Async | Workshop + async |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | RAID Log, Status Report Source | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | RiskTrackingStakeholdersGovernance | ArchitectureQualityRiskTradeoffsStakeholders |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






