View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Cost of Delay | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Architecture Architecture Decision Record |
|---|---|---|---|
Purposedifferent | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. |
Complexitydifferent | High | Medium | Low |
Timedifferent | 90-180 min | 2–4 h review as a planning range; preparation and evaluation additional | 15-45 min |
Participantsdifferent | 3-8 | Designers, developers as users, and facilitation | 1-3 |
Formatdifferent | Workshop | Workshop + async | Async |
Outputdifferent | CoD Table, Prioritization Sequence | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | ADR File, Decision Log, Rationale |
Tagsno overlap | PrioritizationDeliveryEconomicsDecision | ArchitectureEngineeringFeedbackValidationTasks | ArchitectureRationaleDocumentationGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






