methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Competency Questions with its method-specific working model.
Knowledge Modeling
Competency Questions
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
Competency Questions translate a domain model into concrete questions that it must be able to answer. The method keeps the model's scope clean and prevents pretty but useless structures.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumLowLow
Timedifferent
2-4 h30 min Setup, dann laufend15-30 min
Participantsdifferent
2-81-3 maintaining, briefing for everyone2-6
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
Competency Question Set, Required Concepts, Test Queries, Coverage MatrixRAID Log, Status Report SourceRoot cause notes, Countermeasures
Tagsno overlap
OntologyKnowledge graphScopeRequirementsSemantic
RiskTrackingStakeholdersGovernance
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)