methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
LowMediumMedium
Timedifferent
1-4 hOngoinglaufend
Participantsdifferent
1-52-122-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Context Diagram, Container Diagram, Component DiagramKanban board, WIP policies, Flow metricsThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
ArchitectureCommunicationVisualization
FlowVisual managementDelivery
EstimationForecastingFlow
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Architecture Communication Canvas method illustration showing its working structure
Architecture
Architecture Communication Canvas
Paper illustration for Communication Plan
Delivery
Communication Plan