View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Delivery RAID Log | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 1-3 h | 30 min Setup, dann laufend | 45-90 min |
Participantsdifferent | 3-8 | 1-3 maintaining, briefing for everyone | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop + async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | RAID Log, Status Report Source | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | FlowMeasurementConstraints | RiskTrackingStakeholdersGovernance | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






