Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
MediumMediumLow
Timedifferent
1-3 hOngoing60-90 min
Participantsdifferent
3-82-124-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
FacilitationDecisionProblem solvingWorkshop
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe