View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Delivery RAID Log | ![]() Architecture Architecture Decision Record |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. |
Complexitysame | Low | Low | Low |
Timedifferent | 45-90 min | 30 min Setup, dann laufend | 15-45 min |
Participantsdifferent | 2-8 | 1-3 maintaining, briefing for everyone | 1-3 |
Formatdifferent | Workshop + async | Async | Async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | RAID Log, Status Report Source | ADR File, Decision Log, Rationale |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | RiskTrackingStakeholdersGovernance | ArchitectureRationaleDocumentationGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






