View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Operations Kaizen Event | ![]() Operations 8D Problem Solving |
|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Low | Medium | High |
Timedifferent | 45-90 min | 0.5-5 Tage | 1-6 Wochen |
Participantsdifferent | 2-8 | 4-10 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | LeanContinuous improvementOperations | QualityProblem solvingRoot cause |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






