View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Decision Making Pre-Mortem | ![]() Decision Making Risk Matrix |
|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | 20–45 min | 30-60 min |
Participantsdifferent | Designers, developers as users, and facilitation | Small cross-functional group | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Risk list, Mitigation plan, Assumption log | Risk Matrix, Top Risk List |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | RiskDecisionFailurePlanning | RiskDecisionPrioritizationAssessment |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.