View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Business Strategy Business Model Stress Test | ![]() Product Strategy Lean Canvas |
|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | A Business Model Stress Test checks how well a business model holds up under pressure and headwinds. It compares strengths, risks, market logic, and courses of action. The result is captured as a stress-test report and action plan per scenario. | When an early product bet still has too many open points, it brings target group, problem, and assumptions into a single view. It condenses the idea so core risks become nameable. |
Complexitydifferent | Medium | High | Medium |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | Half day | 45-90 min |
Participantsdifferent | Designers, developers as users, and facilitation | 3-8 | 1-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Stress Test Report, Action Plan per Scenario | Lean Canvas, Core Assumptions, Experiment Backlog |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | StrategyBusiness modelRiskDiagnosis | StartupLeanAssumptionsBusiness model |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






