View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Facilitation Alignment Mapping | ![]() Facilitation Power Interest Grid |
|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | 1-2 h | 30-60 min |
Participantsdifferent | Designers, developers as users, and facilitation | 4-12 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Alignment Map, Open Issues, Decision Questions | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | AlignmentStakeholdersStrategyFacilitation | StakeholdersFacilitationAlignmentPlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






