View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ALPEN Method | ![]() Architecture arc42 | ![]() Operations 5 Whys |
|---|---|---|---|
Purposedifferent | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitysame | Low | Low | Low |
Timedifferent | 10-20 min daily | 1-2 Tage | 15-30 min |
Participantsdifferent | 1 | 1-4 | 2-6 |
Formatdifferent | Async | Workshop + async | Workshop |
Outputdifferent | Daily Plan, Time Estimates, Review Notes | Architecture Document, Context View, Runtime View, Deployment View | Root cause notes, Countermeasures |
Tagsno overlap | PlanningTime managementProductivityOperations | ArchitectureDocumentationCommunication | Root causeIncidentLeanProblem solving |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






