View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations 8D Problem Solving | ![]() Operations 5 Whys | ![]() Product Discovery Riskiest Assumption Test |
|---|---|---|---|
Purposedifferent | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 1-6 Wochen | 15-30 min | 1-2 Wochen pro Iteration |
Participantsdifferent | 4-10 | 2-6 | 2-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Root cause notes, Countermeasures | Prioritized Assumption List, Test Plan, Results Report |
Tagsno overlap | QualityProblem solvingRoot cause | Root causeIncidentLeanProblem solving | ExperimentsValidationDiscoveryAssumptions |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






