Plan my session
Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.
Session: Sailboat Retrospective
The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.
Method session with 4-12. The plan uses the existing method logic and the runsheet.
RunsheetUse the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
The session works directly toward Sailboat Board. After the session, the artifact should be shareable, reviewable, or reusable.
- 1
Phase 1: Define the island
5-10 minFormulate the island as a shared goal (one to three clear outcomes). If unclear, do a short clarification; otherwise pause the retro. Hint: Without a clear goal the metaphor loses meaning. The island must be concrete ("MVP launched by 06/30"), not abstract.
FacilitatorSailboat Board - 2
Phase 2: Wind and anchors
15-20 minSilent work. Each person writes 2-3 wind stickies (what moves us forward) and 2-3 anchor stickies (what holds us back). Make them concrete, with examples. Hint: Wind is more than "good atmosphere". Name what specifically helps: tools, practices, role constellations. Same for anchors: what weighs the team down, and by which mechanism.
FacilitatorRisks - 3
Phase 3: Rocks and risks
10-15 minWhat lies ahead of the boat, what could prevent reaching the island? Each person writes 1-3 rock stickies. In an online tool, optionally use a separate symbol for external risks. Hint: Rocks are future-oriented, not historical problems. If people only note the past here, they are repeating phase 2.
FacilitatorImprovement Actions - 4
Phase 4: Cluster and vote
10-15 minForm clusters. Dot-vote (3 dots per person across all elements). Identify top clusters per element. Hint: Anchors and rocks are often most important for actions, wind for "continue deliberately". Keep the balance.
FacilitatorSailboat Board - 5
Phase 5: Actions
15-30 minDefine an action or mitigation for each top cluster. Rocks need a risk plan (mitigation and trigger). Limit to 5 actions, each with owner and date. Hint: Rock actions are often risk reduction, not instant solutions. Formulate triggers ("if X happens, then Y").
OwnerRisks - 6
Publish artifact
10 minCheck the artifact for completeness, define location, set version or status, and name review recipients.
OwnerSailboat Board
Session Brief
For invitations, boards, tickets, PR descriptions, or workshop notes.
session-brief.md
Session Brief: Sailboat Retrospective
Goal
Artifact: Sailboat Board
Working Question
What moves the team toward the goal, what holds it back, what risks lie ahead, and which actions follow?
Context
Clear team goal or sprint/project outcome as the island; previous retro actions; known risks from the current pipeline; mood indicator.
Setup
- Format: Method session
- Duration: 45-90 min
- Mode: Workshop
- Participants: One facilitator; 4-12 team members; scribe.
- Owner: One facilitator
- Participation mode: Team round, shared work and alignment
- Outcome logic: Finish artifact
Participation Logic
Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
Outcome Logic
The session works directly toward Sailboat Board. After the session, the artifact should be shareable, reviewable, or reusable.
Input
Whiteboard or Miro board with a pre-drawn sailboat (island = goal, wind = supporting factors, anchors = slowing factors, rocks = risks); stickies; timer; action tracker.
Preparation
Sailboat clearly labeled with four elements. Island on the right with goal statement. Wind above, anchors below the boat, rocks ahead in the water. Rule: each person contributes at least 2 stickies per element.
Agenda
-
Phase 1: Define the island (5-10 min) Owner: Facilitator Action: Formulate the island as a shared goal (one to three clear outcomes). If unclear, do a short clarification; otherwise pause the retro. Hint: Without a clear goal the metaphor loses meaning. The island must be concrete ("MVP launched by 06/30"), not abstract. Output: Sailboat Board
-
Phase 2: Wind and anchors (15-20 min) Owner: Facilitator Action: Silent work. Each person writes 2-3 wind stickies (what moves us forward) and 2-3 anchor stickies (what holds us back). Make them concrete, with examples. Hint: Wind is more than "good atmosphere". Name what specifically helps: tools, practices, role constellations. Same for anchors: what weighs the team down, and by which mechanism. Output: Risks
-
Phase 3: Rocks and risks (10-15 min) Owner: Facilitator Action: What lies ahead of the boat, what could prevent reaching the island? Each person writes 1-3 rock stickies. In an online tool, optionally use a separate symbol for external risks. Hint: Rocks are future-oriented, not historical problems. If people only note the past here, they are repeating phase 2. Output: Improvement Actions
-
Phase 4: Cluster and vote (10-15 min) Owner: Facilitator Action: Form clusters. Dot-vote (3 dots per person across all elements). Identify top clusters per element. Hint: Anchors and rocks are often most important for actions, wind for "continue deliberately". Keep the balance. Output: Sailboat Board
-
Phase 5: Actions (15-30 min) Owner: Owner Action: Define an action or mitigation for each top cluster. Rocks need a risk plan (mitigation and trigger). Limit to 5 actions, each with owner and date. Hint: Rock actions are often risk reduction, not instant solutions. Formulate triggers ("if X happens, then Y"). Output: Risks
-
Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: Sailboat Board
Closeout
- Update result artifact: Sailboat Board
- Define location, version, and review recipients.
- Define owner, next step, and review date.
Work artifact
Pre-filled starting point based on the matching template.
work-artifact.md
Sailboat Board: Sailboat Retrospective
Working Question
What moves the team toward the goal, what holds it back, what risks lie ahead, and which actions follow?
Context
Clear team goal or sprint/project outcome as the island; previous retro actions; known risks from the current pipeline; mood indicator.
Participants
- Owner: One facilitator
- Participants: One facilitator; 4-12 team members; scribe.
Input
Whiteboard or Miro board with a pre-drawn sailboat (island = goal, wind = supporting factors, anchors = slowing factors, rocks = risks); stickies; timer; action tracker.
Template
Sailboat Retrospective Working Template
Goal
Use the sailboat metaphor to surface what moves the team forward and what holds it back.
Context
Which time frame or delivery should the team review?
Input
- Time frame:
- Team or group:
- Notes, signals, or examples:
Working area
- Destination island:
- Winds:
- Anchors:
- Rocks:
- Patterns:
Output artifacts
- Sailboat board:
- Risk list:
- Improvement actions:
Open questions
- ...
Decision / next step
Owner, date, and success signal.
Completion Check
- Sailboat Board is complete enough for review:
- Location:
- Version / status:
- Review by:
- Next step:
Next Step
- Review result
- Mark open questions
- Schedule review or decision
Sailboat Retrospective Working Template
View templateCompact working template for the Sailboat retrospective with winds, anchors, rocks, and next actions.canvas
sailboat-retrospective-working-template.md
Compact working template for the Sailboat retrospective with winds, anchors, rocks, and next actions.
Sailboat Retrospective Working Template
Goal
Use the sailboat metaphor to surface what moves the team forward and what holds it back.
Context
Which time frame or delivery should the team review?
Input
- Time frame:
- Team or group:
- Notes, signals, or examples:
Working area
- Destination island:
- Winds:
- Anchors:
- Rocks:
- Patterns:
Output artifacts
- Sailboat board:
- Risk list:
- Improvement actions:
Open questions
- ...
Decision / next step
Owner, date, and success signal.
- Working question, owner, and target artifact are visible.
- The result fits Sailboat Board.
- One entry per retro with date and island goal in the title. Maintain rocks across multiple retros as a risk register, archive wind clusters as success patterns.
- Open questions are noted as follow-ups.
- The next review or decision point is scheduled.