Plan my session
Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.
Session: Current Reality Tree
The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.
Method session with 3-8. The plan uses the existing method logic and the runsheet.
RunsheetUse the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
The session works directly toward Current Reality Tree. After the session, the artifact should be shareable, reviewable, or reusable.
- 1
Phase 1: Collect UDEs
30-45 minSolo sketching 10 min: each person writes at least five UDEs (negative, measurable, experienced effects). Group clustering, merge duplicates, compress to 10-15 UDEs. Formulate each UDE as complete sentence. Hint: UDEs are not causes but observed effects. "Onboarding is bad" is a diagnosis, "Two of five new customers drop out in week 1" is a UDE.
FacilitatorCurrent Reality Tree - 2
Phase 2: Form causal links
60-90 minAsk backward for each UDE: what must hold true for this effect to occur? Post hypotheses as intermediate nodes and connect with arrows. Arrows carry causal statements, for example "if A then B". Hint: Every arrow is checked with CLR (Categories of Legitimate Reservation): clarity, existence, causality, sufficiency, predictability. The person who adds arrows must explain each one.
FacilitatorCore Problems - 3
Phase 3: Logic check
30-45 minWalk bottom to top together. For each arrow ask: are there counterexamples, is cause sufficient on its own or is a missing condition needed? Mark weak arrows with assumption stickers. Hint: Logic checks are the most expensive phase and the real value of the method. Shortcutting it leaves a mind map instead of a CRT.
FacilitatorIntervention Ideas - 4
Phase 4: Identify core causes
20-30 minTrace paths and mark common roots. A cause that explains several UDEs is a core-cause candidate. Mark the top 1-3 core causes. Hint: If every UDE has its own root, the tree is incomplete or the UDEs are in multiple systems. In the first case, continue connecting, in the second narrow the scope.
FacilitatorCurrent Reality Tree - 5
Phase 5: Interventions and follow-up
20-30 minCollect intervention ideas for each core cause. For each idea note which UDEs it would resolve, owner, next step, and review date. Hint: Interventions are validated later with the Future Reality Tree. CRT diagnoses, FRT creates treatment design; both belong together.
OwnerCore Problems - 6
Publish artifact
10 minCheck the artifact for completeness, define location, set version or status, and name review recipients.
OwnerCurrent Reality Tree
Session Brief
For invitations, boards, tickets, PR descriptions, or workshop notes.
session-brief.md
Session Brief: Current Reality Tree
Goal
Artifact: Current Reality Tree
Working Question
Which few core causes lie under the system's undesirable effects, and at which leverage points would an intervention resolve the most UDEs at once?
Context
Scope or system boundary; list of known problems from the last quarters; known improvement initiatives that did not work; definition of "undesirable effect" (UDE).
Setup
- Format: Method session
- Duration: 2-6 h
- Mode: Workshop
- Participants: A facilitator with ToC experience who runs logic checks; three to eight participants from different functions (Sales, Operations, Engineering, Support); a scribe for assumptions and logic checks.
- Owner: A facilitator with ToC experience who runs logic checks
- Participation mode: Team round, shared work and alignment
- Outcome logic: Finish artifact
Participation Logic
Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
Outcome Logic
The session works directly toward Current Reality Tree. After the session, the artifact should be shareable, reviewable, or reusable.
Input
Large whiteboard or Miro board (at least 6 m horizontal), sticky notes in two colors (UDEs, intermediate causes), arrows/markers for causal links, timer, shared definition of UDE.
Preparation
Mark a UDE area on the right of the board (UDEs at top), causal chain to the left (deeper into system). Post example UDE and example causal arrow as template. Turn off phones and set one uninterrupted time block.
Agenda
-
Phase 1: Collect UDEs (30-45 min) Owner: Facilitator Action: Solo sketching 10 min: each person writes at least five UDEs (negative, measurable, experienced effects). Group clustering, merge duplicates, compress to 10-15 UDEs. Formulate each UDE as complete sentence. Hint: UDEs are not causes but observed effects. "Onboarding is bad" is a diagnosis, "Two of five new customers drop out in week 1" is a UDE. Output: Current Reality Tree
-
Phase 2: Form causal links (60-90 min) Owner: Facilitator Action: Ask backward for each UDE: what must hold true for this effect to occur? Post hypotheses as intermediate nodes and connect with arrows. Arrows carry causal statements, for example "if A then B". Hint: Every arrow is checked with CLR (Categories of Legitimate Reservation): clarity, existence, causality, sufficiency, predictability. The person who adds arrows must explain each one. Output: Core Problems
-
Phase 3: Logic check (30-45 min) Owner: Facilitator Action: Walk bottom to top together. For each arrow ask: are there counterexamples, is cause sufficient on its own or is a missing condition needed? Mark weak arrows with assumption stickers. Hint: Logic checks are the most expensive phase and the real value of the method. Shortcutting it leaves a mind map instead of a CRT. Output: Intervention Ideas
-
Phase 4: Identify core causes (20-30 min) Owner: Facilitator Action: Trace paths and mark common roots. A cause that explains several UDEs is a core-cause candidate. Mark the top 1-3 core causes. Hint: If every UDE has its own root, the tree is incomplete or the UDEs are in multiple systems. In the first case, continue connecting, in the second narrow the scope. Output: Current Reality Tree
-
Phase 5: Interventions and follow-up (20-30 min) Owner: Owner Action: Collect intervention ideas for each core cause. For each idea note which UDEs it would resolve, owner, next step, and review date. Hint: Interventions are validated later with the Future Reality Tree. CRT diagnoses, FRT creates treatment design; both belong together. Output: Core Problems
-
Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: Current Reality Tree
Closeout
- Update result artifact: Current Reality Tree
- Define location, version, and review recipients.
- Define owner, next step, and review date.
Work artifact
Pre-filled starting point based on the matching template.
work-artifact.md
Current Reality Tree: Current Reality Tree
Working Question
Which few core causes lie under the system's undesirable effects, and at which leverage points would an intervention resolve the most UDEs at once?
Context
Scope or system boundary; list of known problems from the last quarters; known improvement initiatives that did not work; definition of "undesirable effect" (UDE).
Participants
- Owner: A facilitator with ToC experience who runs logic checks
- Participants: A facilitator with ToC experience who runs logic checks; three to eight participants from different functions (Sales, Operations, Engineering, Support); a scribe for assumptions and logic checks.
Input
Large whiteboard or Miro board (at least 6 m horizontal), sticky notes in two colors (UDEs, intermediate causes), arrows/markers for causal links, timer, shared definition of UDE.
Template
Current Reality Tree Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Current Reality Tree:
- Core Problems:
- Intervention Ideas:
Open questions
- ...
Next step
Owner, date, success signal.
Completion Check
- Current Reality Tree is complete enough for review:
- Location:
- Version / status:
- Review by:
- Next step:
Next Step
- Review result
- Mark open questions
- Schedule review or decision
Current Reality Tree Working Template
View templateCompact working template for Current Reality Tree with context, input, output artifacts, and next step.canvas
current-reality-tree-working-template.md
Compact working template for Current Reality Tree with context, input, output artifacts, and next step.
Current Reality Tree Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Current Reality Tree:
- Core Problems:
- Intervention Ideas:
Open questions
- ...
Next step
Owner, date, success signal.
- Working question, owner, and target artifact are visible.
- The result fits Current Reality Tree.
- One diagnostic run per entry with date, area, and participants. Do not overwrite follow-up iterations; record changes in the diagram as a delta list at document end.
- Open questions are noted as follow-ups.
- The next review or decision point is scheduled.