View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Engineering Failure Scenario Analysis |
|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. |
Complexitydifferent | Low | Medium |
Timedifferent | 45-120 min | 1-3 h |
Participantsdifferent | 2-8 | 3-8 |
Formatsame | Workshop | Workshop |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions |
Tagsno overlap | WasteLeanProcess improvement | FailureResilienceRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





