methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitysame
LowLowLow
Timedifferent
Ongoing5-20 min15-45 min
Participantsdifferent
1-203-201-3
Formatdifferent
Workshop + asyncWorkshopAsync
Outputdifferent
Visual Board, Status Indicators, Exception CuesEffort Heatmap, Risk Signals, Discussion TargetsADR File, Decision Log, Rationale
Tagsno overlap
SignalsOperationsVisual management
EstimationEffortRisk
ArchitectureRationaleDocumentationGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis