methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.
Complexitydifferent
MediumHighMedium
Timedifferent
10-30 min je Item2-4 h Analyse, laufend15-45 min
Participantsdifferent
1-83-121-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesConstraint Map, Improvement Plan, Flow MetricsPERT Estimate, Expected Value, Risk Notes
Tagsno overlap
EstimationUncertaintyForecasting
OperationsConstraintsFlowImprovement
EstimationUncertaintyRisk
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation