View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Operations Theory of Constraints | ![]() Delivery Monte Carlo Forecasting |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication. |
Complexitydifferent | Medium | High | High |
Timedifferent | 10-30 min je Item | 2-4 h Analyse, laufend | 30-90 min Setup, danach laufend |
Participantsdifferent | 1-8 | 3-12 | 1-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Constraint Map, Improvement Plan, Flow Metrics | Forecast Percentiles, Throughput Dataset, Risk Communication |
Tagsno overlap | EstimationUncertaintyForecasting | OperationsConstraintsFlowImprovement | ForecastingFlowDelivery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






