methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
MediumHighLow
Timedifferent
10-30 min je ItemHalber Tag5-20 min
Participantsdifferent
1-85-203-20
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesSimulation Notes, Gaps List, Updated RunbooksEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
EstimationUncertaintyForecasting
ResilienceOperationsIncident
EstimationEffortRisk
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis