View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Facilitation Dot Estimation | ![]() Operations 8D Problem Solving |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Medium | Low | High |
Timedifferent | 10-30 min je Item | 5-20 min | 1-6 Wochen |
Participantsdifferent | 1-8 | 3-20 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Effort Heatmap, Risk Signals, Discussion Targets | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | EstimationUncertaintyForecasting | EstimationEffortRisk | QualityProblem solvingRoot cause |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






