View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Operations Bottleneck Analysis | ![]() Operations Theory of Constraints |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. |
Complexitydifferent | Medium | Medium | High |
Timedifferent | 10-30 min je Item | 1-3 h | 2-4 h Analyse, laufend |
Participantsdifferent | 1-8 | 3-8 | 3-12 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Constraint Map, Improvement Plan, Flow Metrics |
Tagsno overlap | EstimationUncertaintyForecasting | FlowMeasurementConstraints | OperationsConstraintsFlowImprovement |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






