View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Theory of Constraints | ![]() Operations Time Blocking | ![]() Operations Bottleneck Analysis |
|---|---|---|---|
Purposedifferent | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 2-4 h Analyse, laufend | 15-30 min Planung, laufend | 1-3 h |
Participantsdifferent | 3-12 | 1 | 3-8 |
Formatdifferent | Workshop + async | Async | Workshop + async |
Outputdifferent | Constraint Map, Improvement Plan, Flow Metrics | Blocked Calendar, Capacity View, Focus Plan | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures |
Tagsno overlap | OperationsConstraintsFlowImprovement | PlanningTime managementFocus | FlowMeasurementConstraints |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






