methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Process Mapping method illustration showing its working structure
Operations
Process Mapping
Purposedifferent
For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.With a confusing workflow that has many handoffs, the method makes the actual process visible. It shows where work is passed on, delayed, or duplicated, so improvement targets the right spots.
Complexitydifferent
HighMediumMedium
Timedifferent
2-4 h Analyse, laufendOngoing1-3 h
Participantsdifferent
3-122-123-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Constraint Map, Improvement Plan, Flow MetricsKanban board, WIP policies, Flow metricsProcess Map, Handoff List, Improvement Backlog
Tagsno overlap
OperationsConstraintsFlowImprovement
FlowVisual managementDelivery
ProcessOperationsImprovement
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Gemba Walk workspace showing the question, observations, and next decision.
Operations
Gemba Walk
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting