View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Scatter Diagram | ![]() Systems Thinking Rich Picture |
|---|---|---|
Purposedifferent | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. |
Complexitysame | Low | Low |
Timesame | 30-90 min | 30-90 min |
Participantsdifferent | 1-4 | 2-10 |
Formatdifferent | Workshop + async | Workshop |
Outputdifferent | Scatter Plot, Korrelationsnotiz, Hypothesenliste | Rich Picture, Problem Framing Notes |
Tags1 shared | Root causeQualityVisualization | Systems thinkingSoft systemsFramingVisualization |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





