View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Scatter Diagram | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Fault Tree Analysis |
|---|---|---|---|
Purposedifferent | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | Low | High | High |
Timedifferent | 30-90 min | 2-6 h | 2-6 h |
Participantsdifferent | 1-4 | 3-10 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Scatter Plot, Korrelationsnotiz, Hypothesenliste | FMEA Table, Risk Priority, Mitigation Actions | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tags1 shared | Root causeQualityVisualization | RiskQualityOperationsRoot cause | RiskRoot causeSafety |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






