methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for 1-2-4-All.
Facilitation
1-2-4-All
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When many people in a group too rarely get to speak, 1-2-4-All distributes thinking time more fairly. The format builds participation step by step and makes quiet or still-unformed thoughts usable faster.
Complexitysame
LowLow
Timedifferent
60-90 min10-20 min
Participantsdifferent
4-124-100+
Formatsame
WorkshopWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogIdea List, Shared Insights, Emergent Themes
Tagsno overlap
RiskArchitectureWorkshopValidation
FacilitationInclusionIdeation
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Round Robin Brainstorming
Innovation
Round Robin Brainstorming
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)