methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
LowHighLow
Timedifferent
30-60 min45-90 min20–45 min
Participantsdifferent
3-103-10Small cross-functional group
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListRanked Backlog, Cost-of-Delay AssumptionsRisk list, Mitigation plan, Assumption log
Tagsno overlap
RiskDecisionPrioritizationAssessment
LeanEconomicsSequencePrioritization
RiskDecisionFailurePlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis