methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighLow
Timedifferent
30-60 min45-90 min15-30 min
Participantsdifferent
3-103-102-6
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListRanked Backlog, Cost-of-Delay AssumptionsRoot cause notes, Countermeasures
Tagsno overlap
RiskDecisionPrioritizationAssessment
LeanEconomicsSequencePrioritization
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving