methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitysame
LowLowLow
Timedifferent
30 min Setup, dann laufend5-20 min15-30 min
Participantsdifferent
1-3 maintaining, briefing for everyone3-202-6
Formatdifferent
AsyncWorkshopWorkshop
Outputdifferent
RAID Log, Status Report SourceEffort Heatmap, Risk Signals, Discussion TargetsRoot cause notes, Countermeasures
Tagsno overlap
RiskTrackingStakeholdersGovernance
EstimationEffortRisk
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)