methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.
Complexitydifferent
MediumMediumHigh
Timedifferent
laufend10-30 min je Item2-4 h Analyse, laufend
Participantsdifferent
2-121-83-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesThree-Point Estimate, Risk Range, Assumption NotesConstraint Map, Improvement Plan, Flow Metrics
Tagsno overlap
EstimationForecastingFlow
EstimationUncertaintyForecasting
OperationsConstraintsFlowImprovement
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation