methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.
Complexitysame
MediumMediumMedium
Timedifferent
laufendOngoing1-3 Wochen vom Draft bis zur Entscheidung
Participantsdifferent
2-122-123-20 Reviewer
Formatdifferent
Workshop + asyncWorkshop + asyncAsync
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesKanban board, WIP policies, Flow metricsRFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets
Tagsno overlap
EstimationForecastingFlow
FlowVisual managementDelivery
ArchitectureDecisionAsyncGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay