View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Kanban | ![]() Operations Bottleneck Analysis | ![]() Operations 5 Whys |
|---|---|---|---|
Purposedifferent | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | Ongoing | 1-3 h | 15-30 min |
Participantsdifferent | 2-12 | 3-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Kanban board, WIP policies, Flow metrics | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Root cause notes, Countermeasures |
Tagsno overlap | FlowVisual managementDelivery | FlowMeasurementConstraints | Root causeIncidentLeanProblem solving |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






