methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
MediumMediumLow
Timedifferent
Multiple workshops over several weeks10-30 min je Item15-60 min
Participantsdifferent
2-81-82-9
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Hooked loop, Trigger map, Reward design, Ethics checkThree-Point Estimate, Risk Range, Assumption NotesIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
GrowthBehaviorRetention
EstimationUncertaintyForecasting
EstimationEffortAgile
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.