View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Business Strategy 5-Minuten VC-Check | ![]() Innovation Design Charrette | ![]() Innovation SCAMPER |
|---|---|---|---|
Purposedifferent | The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list. | In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space. | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. |
Complexitydifferent | Low | Medium | Low |
Timedifferent | 5-15 min | Halber Tag bis mehrere Tage | 30-60 min |
Participantsdifferent | 1-5 | 10-50 | 2-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | VC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation step | Sketches and Concepts, Consolidated Solution Sketch, Prioritized Direction | SCAMPER Idea List, Concept Shortlist, Variation Notes |
Tagsno overlap | StartupValidationCompetition | BrainstormingWorkshopCollaborationIdeation | BrainstormingIdeationCreativityReframingInnovation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






