View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Engineering Kanban | ![]() Operations Bottleneck Analysis |
|---|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. |
Complexitydifferent | High | Medium | Medium |
Timedifferent | 2-6 h | Ongoing | 1-3 h |
Participantsdifferent | 3-8 | 2-12 | 3-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Kanban board, WIP policies, Flow metrics | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures |
Tagsno overlap | RiskRoot causeSafety | FlowVisual managementDelivery | FlowMeasurementConstraints |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






