View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:Failure Scenario AnalysisStakeholder Salience ModelATAM (Architecture Tradeoff Analysis Method)
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Facilitation Stakeholder Salience Model | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) |
|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. |
Complexitydifferent | Medium | Medium | High |
Timedifferent | 1-3 h | 60-90 min | Several meetings plus preparation and analysis; total effort depends on scope |
Participantsdifferent | 3-8 | 3-6 | Evaluation team, architects, and relevant stakeholders |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Salience Diagram, Strategy per Class | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations |
Tagsno overlap | FailureResilienceRisk | StakeholdersFacilitationAlignmentGovernance | ArchitectureQualityRiskTradeoffsStakeholders |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






