View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Architecture Architecture Decision Record | ![]() Decision Making Risk Matrix |
|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 1-3 h | 15-45 min | 30-60 min |
Participantsdifferent | 3-8 | 1-3 | 3-10 |
Formatdifferent | Workshop | Async | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | ADR File, Decision Log, Rationale | Risk Matrix, Top Risk List |
Tagsno overlap | FailureResilienceRisk | ArchitectureRationaleDocumentationGovernance | RiskDecisionPrioritizationAssessment |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






