View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Facilitation 1-2-4-All | ![]() Decision Making Pre-Mortem |
|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When many people in a group too rarely get to speak, 1-2-4-All distributes thinking time more fairly. The format builds participation step by step and makes quiet or still-unformed thoughts usable faster. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 1-3 h | 10-20 min | 20–45 min |
Participantsdifferent | 3-8 | 4-100+ | Small cross-functional group |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Idea List, Shared Insights, Emergent Themes | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | FailureResilienceRisk | FacilitationInclusionIdeation | RiskDecisionFailurePlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






