View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Architecture Risk Storming | ![]() Architecture Software Architecture Canvas |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly. |
Complexitysame | Low | Low | Low |
Timedifferent | 5-20 min | 60-90 min | 1-2 h |
Participantsdifferent | 3-20 | 4-12 | 3-10 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Annotated Diagram, Prioritized Risk List, Action Backlog | Architecture Canvas, Goals, Constraints, Quality Attributes |
Tagsno overlap | EstimationEffortRisk | RiskArchitectureWorkshopValidation | CanvasArchitectureAlignmentWorkshop |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






