View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Facilitation Decision Jam | ![]() Operations 5 Whys |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitysame | Low | Low | Low |
Timedifferent | 5-20 min | 60-90 min | 15-30 min |
Participantsdifferent | 3-20 | 4-10 | 2-6 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Problem Cluster, Prioritized Challenge, Experiment | Root cause notes, Countermeasures |
Tagsno overlap | EstimationEffortRisk | FacilitationDecisionProblem solvingWorkshop | Root causeIncidentLeanProblem solving |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






