View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Delivery Value Stream Mapping | ![]() Facilitation Power Interest Grid |
|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 1-3 h | 1-3 h | 30-60 min |
Participantsdifferent | 3-8 | 4-10 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Current-state map, Future-state map, Bottleneck list | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | FlowMeasurementConstraints | LeanFlowWasteDelivery | StakeholdersFacilitationAlignmentPlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






