methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighMedium
Timedifferent
1-3 h2-4 h Analyse, laufendOngoing
Participantsdifferent
3-83-122-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow MetricsKanban board, WIP policies, Flow metrics
Tags1 shared
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
FlowVisual managementDelivery
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Process Mapping method illustration showing its working structure
Operations
Process Mapping
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping