Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
MediumHighLow
Timedifferent
1-3 h2-4 h Analyse, laufend15-60 min
Participantsdifferent
3-83-122-9
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow MetricsIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
EstimationEffortAgile
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation