View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Facilitation Team Charter | ![]() Facilitation Power Interest Grid |
|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When a team is starting fresh or working past each other, Team Charter clarifies the shared working basis. It visibly sets out how collaboration, decision paths, and mutual conduct should work day to day. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 1-3 h | 2-4 h | 30-60 min |
Participantsdifferent | 3-8 | 3-12 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Team Charter, Working Norms, Role Notes | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | FlowMeasurementConstraints | TeamAlignmentCollaboration | StakeholdersFacilitationAlignmentPlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






