View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Agile Planning Poker |
|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions. |
Complexitydifferent | Medium | Low |
Timedifferent | 1-3 h | 2-5 min je Item |
Participantsdifferent | 3-8 | 3-9 |
Formatsame | Workshop + async | Workshop + async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Relative Estimates, Assumption Notes, Split Candidates |
Tagsno overlap | FlowMeasurementConstraints | EstimationAgileRelative sizingTeam |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





