View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Engineering Kanban | ![]() Facilitation Power Interest Grid |
|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 1-3 h | Ongoing | 30-60 min |
Participantsdifferent | 3-8 | 2-12 | 2-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Kanban board, WIP policies, Flow metrics | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | FlowMeasurementConstraints | FlowVisual managementDelivery | StakeholdersFacilitationAlignmentPlanning |