methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighMedium
Timedifferent
1-3 h90-180 minOngoing
Participantsdifferent
3-83-82-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresCoD Table, Prioritization SequenceKanban board, WIP policies, Flow metrics
Tagsno overlap
FlowMeasurementConstraints
PrioritizationDeliveryEconomicsDecision
FlowVisual managementDelivery
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of ICE Scoring with its method-specific working model.
Product Strategy
ICE Scoring
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting