View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Discovery Assumption Mapping | ![]() Innovation Design Sprint | ![]() Innovation SCAMPER |
|---|---|---|---|
Purposedifferent | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. |
Complexitydifferent | Medium | High | Low |
Timedifferent | 45-60 min | 4-5 Tage | 30-60 min |
Participantsdifferent | 2-8 | 5-8 | 2-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Assumption map, Test backlog, Risk ranking | Prototype, Test Findings, Decision Rationale | SCAMPER Idea List, Concept Shortlist, Variation Notes |
Tagsno overlap | AssumptionsRiskExperimentsValidation | Design sprintPrototypeValidationInnovation | BrainstormingIdeationCreativityReframingInnovation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






